Map · ERCOT
Every publicly disclosed Texas data center, AI greenfield, and crypto-pivot site, plotted against real-time ERCOT prices and the Batch Zero / PCLR deadline clock. Built from press releases, SEC filings, and ERCOT meeting materials. The wedge is the regulatory friction layered on top, not the map itself.
Disclosed sites · ERCOT footprint
dot size · disclosed MW · scroll or pinch to zoom · drag to pan
MW
Fill: live LMP interpolated from nearby hubs vs. system avg · cool = below, warm = above.
This is a leadgen visualization, not an authoritative datacenter registry. Expect entries to be ±15% on MW, missing recent disclosures, and stale on stage transitions. Refresh quarterly.
Counties to watch
ERCOT's PCLR (Provisional Controllable Load Resource) declaration window doesn't open until July 24, 2026, so there's no public list of PCLR participants. ERCOT's CLR registry and the PUCT crypto-miner registry are also non-public. The counties below are the ones with operating flex load today, sourced per-site from SEC filings and direct company disclosures — these are the most likely first declarants when PCLR opens.
Milam County
Houston hub
1,262 MW operating as flex
Navarro County
PCLR exposure
PCLR isn't gated by county — every ERCOT-area large load can declare. The cut that matters is curtailment frequency, which varies sharply by hub. Panhandle and West Texas sit on the wind-export bottleneck and clear most often; South Texas least. The map above tells you where the demand is; this one tells you which of those sites will see the most curtailment events.
Concentration
The disclosed pipeline is not evenly distributed. The North zone (DFW metro) and West Texas absorb most of the announced AI capacity. PCLR / Batch Zero allocation is decided per-node, not per-zone, but zone-level concentration is the first proxy for where the constraint study will bite.
Panhandle
2 sites
11,200 MW disclosed
North (DFW)
16 sites
5,710 MW disclosed
West
4 sites
3,000 MW disclosed
Houston
4 sites
Methodology
A leadgen visualization, not an authoritative datacenter registry. Use it to see the shape of the disclosed pipeline against the live regulatory clock. Don't use it for parcel-level diligence.
Official press releases, SEC filings (10-Ks, S-1s), ERCOT Large Load Workshop slide decks, and major-trade-press coverage. Each site entry carries the source citation; click a site to see it.
Lat/lon are city or county centroids unless a specific facility was publicly geocoded. Precision is sufficient for state-wide visualization, not for parcel work.
Public nameplate or disclosed targets, not metered demand. Phased campuses show the full disclosed envelope, not the energized portion. Expect ±15%.
0 days to PCLR declaration
We’ll model your PCLR economics — shift factor, expected ABC bid cap, LPC firm allocation, tiered compliance coverage, financial commitment profile — and return a pencil / break-even / don’t-enroll recommendation in 72 hours. Free for the first ten projects.
0 MW
0 sites
North (DFW) hub
1,000 MW operating as flex
Ector County
West hub
300 MW operating as flex
Hood County
North (DFW) hub
300 MW operating as flex
Operating as flexmeans a primary source (SEC filing, official company investor disclosure, or ERCOT meeting material) explicitly documents the site participating in an ERCOT load-response, demand-response, responsive-reserves, 4CP, or curtailable-PPA arrangement. The MW shown is verified-flex pipeline inside our disclosed-site corpus only — counties may host additional industrial or non-data-center loads (Permian oil & gas in Ector, legacy aluminum-era infrastructure in Milam, etc.) that are outside this dataset and not characterized here. Sites whose only flex evidence is industry-wide generalization, third-party trade press, or paired-asset inference (e.g., Crusoe-gas-colocated Stargate Abilene, wind-anchored Sweetwater) are excluded until a per-site primary citation lands. Former crypto sites that have converted to AI hyperscale workloads (Galaxy Helios, Core Scientific Denton) are also excluded — the conversion typically retires the curtailment behavior.
See the deeper post on PCLR in three charts for the deal split (firm + flex slice) and the 14-week declaration window.
1,552 MW disclosed
South
4 sites
1,185 MW disclosed