Plain-English framing: a 'moratorium' is a city or county council voting to stop accepting, reviewing, or approving any new data-center applications for a fixed window (here ranging 30 days to 12 months) while staff study water, power, and noise impacts. It...
WGLT / WAND / CBS Minnesota / KUNR / Seattle City Council ↗
ColoradoIllinoisWashingtonMinnesotaMoratorium
Read why it matters →Why a town of 2,000 people matters to a national platform: Cave City is the cleanest example of the 'pre-emptive' moratorium pattern, where a council pauses data centers before any project has actually been proposed or built. It was triggered by a developer...
WBKO / Spectrum News 1 KY / WKYU / WCLU Radio ↗
ColoradoMoratorium
Read why it matters →Plain-English framing: ERCOT runs the Texas grid. It received so many giant new load requests (the queue is over 230 GW, more than 70% data centers) that the normal process — make every project wait years for full transmission upgrades — would freeze the...
EPE Consulting / ERCOT / Zero Emission Grid / Seyfarth Shaw ↗
ERCOTTexasInterconnection
Read why it matters →Plain-English framing: in the U.S. grid, FERC (the federal regulator) governs interstate transmission, while individual state commissions govern local distribution and retail service. Data centers are so large that they blur the line — a single campus can...
Utility Dive / White & Case / American Bar Association / ENR ↗
PJMFERCMoratoriumInterconnectionHyperscaler
Read why it matters →Denver is the cleanest 'yes' outcome of the four. Unanimous (13-0), one-year duration, immediate three-day window before effect (May 21), and the moratorium is scoped specifically to data center as the 'proposed primary use' — meaning a data center...
Denverite / Denver Gazette / 9news / CBS Colorado ↗
ColoradoNorth CarolinaMoratorium
Read why it matters →Charlotte is the contrast case to Denver: same kind of city-council moratorium proposal, similar developer/anti-developer split, but the mayor's tie-break vote went against the procedural fast-track. The substance question is not actually decided yet — the...
Govtech / WBTV / Axios Charlotte / WFAE / AOL ↗
ColoradoNorth CarolinaMoratorium
Read why it matters →Cheyenne is the weakest of the four outcomes for the pause camp. A motion failing to get a second in committee is the procedural equivalent of zero councilors other than the sponsor being willing to publicly support advancing the proposal. The 'no...
Cap City News / Wyoming News / Cowboy State Daily / Wyoming Public Media ↗
VirginiaColoradoNorth CarolinaArizonaMoratoriumHyperscaler
Read why it matters →Cave City is the smallest jurisdiction of the four (population ~2,000) but the most structurally interesting because it's the first Kentucky moratorium in a small town that has NOT yet seen any data center construction. Discovery (a developer Raymond will...
WBKO / Spectrum News 1 KY / WCLU Radio / Bowling Green Daily News / WKMS ↗
ColoradoNorth CarolinaMoratorium
Read why it matters →Plain-English framing: 'co-location' means putting a data center directly next to a power plant and having the plant feed the data center directly (rather than going through the grid). 'Behind the meter' means the generation is on the data center customer's...
FERC / National Law Review / Troutman Energy Report / Akin Gump / Day Pitney ↗
PJMFERCInterconnectionBehind-the-meter
Read why it matters →Plain-English framing: SB 6 is the Texas legislature's response to ERCOT receiving 225 new large-load interconnection requests in 2025 (vs. 152 total from 2022-2024) and tracking ~238.6 GW of large-load requests as of December 2025. The law says: any new load...
PUCT / Perkins Coie / Greenberg Traurig / Bracewell / EPE Consulting / Seyfarth Shaw ↗
ERCOTTexasInterconnection
Read why it matters →Three structurally different state-level outcomes in one week, all in the ratepayer-protection family. Oklahoma is the cleanest version: statute-only, no PUC tariff layer, 75 MW threshold, effective July 1, and the 60-day pre-acquisition notice provision is...
KGOU / OKCFOX / Fox23 / Oklahoma House / Oklahoma Voice / The Gazette CO / Colorado Newsline / Westword / Virginia Mercury / WYDaily / Office of the Governor of Virginia ↗
PJMVirginiaColoradoWisconsinMoratoriumRatepayer protection
Read why it matters →Reno is the second Mountain West city to enact a data-center moratorium this month (after Denver's May 18 vote, which is happening today), and the first in Nevada to do so at any level of government. The 6-1 vote at a 7-hour special meeting is one of the...
The Nevada Independent / Las Vegas Review-Journal / KOLO / Fox Reno / MyNews4 / Govtech / This Is Reno ↗
ColoradoWashingtonMoratorium
Read why it matters →Today is the single highest-density 'moratorium decision day' of 2026 so far. Four municipal-level decisions in geographically distinct markets (Mountain West urban, Sun Belt urban, central Kentucky rural, Mountain West regional capital) plus a structurally...
9news / CBS Colorado / Yellow Scene / Denver Gazette / Cap City News / Wyoming Public Media / WBTV / Axios Charlotte / Govtech / WCLU Radio / Utility Dive ↗
PJMFERCEPATexasMoratoriumInterconnectionBehind-the-meter
Read why it matters →Two parallel Texas tracks. (1) Batch Zero (PGRR145 + NPRR1325) is ERCOT's proposed replacement for the existing one-at-a-time Large Load Interconnection Study (LLIS) process — instead of studying each new large-load request individually, Batch Zero would...
Cliff repo / ERCOT PGRR145 + NPRR1325 / ZeroEmissionGrid / EPE Consulting / SK Energy / Perkins Coie / Mayer Brown / Greenberg Traurig / Baker Botts ↗
ERCOTPJMMISOFERCInterconnectionBehind-the-meter
Read why it matters →Hyperion is the largest single-site hyperscaler gas-fleet buildout in US history. The 10-gas-plant, 7+ GW figure is roughly 2x the next-largest hyperscaler gas commitment on the public tape (Microsoft's Quincy WA campus, ~3.5 GW gas commitment) and roughly...
Yahoo Finance / The Cool Down / WinBuzzer / EnergyNow / Energy Connects / Utility Dive ↗
ERCOTTexasVirginiaTennesseeMoratoriumInterconnectionBehind-the-meter
Read why it matters →HB 2992 is structurally different from the other four state-level ratepayer-protection actions in the May cluster. Pennsylvania's May 8 PUC model tariff is regulator-issued guidance (binding on the four PA investor-owned utilities only after...
Oklahoma House of Representatives / Oklahoma Senate / KGOU / OKCFOX / Fox23 / Oklahoma Energy Today ↗
PJMFERCWisconsinFloridaMoratoriumInterconnectionRatepayer protection
Read why it matters →Cheyenne is the first city anywhere west of the Mississippi to introduce a data-center moratorium ordinance at the council level in 2026 (the Wisconsin/Michigan/Ohio/Indiana cluster is Midwest; the GA/NC/FL/AL cluster is Sun Belt; Texas has no moratorium tape...
Cowboy State Daily / KGAB / Cap City News / Wyoming News / Casper Star-Tribune ↗
ERCOTTexasVirginiaColoradoMoratoriumHyperscaler
Read why it matters →Three more entries in the local-moratorium tape, each illustrating a different sub-pattern. Penn Township MI: pure preemptive moratorium with no land sold and no developer named. The Diamond Lake Association (the local lake-property-owner organization) drove...
WNDU / WSBT / IPM News / Washington Times-Herald / News4Jax / Seehafer News ↗
North CarolinaWisconsinOhioGeorgiaMoratoriumBehind-the-meterHyperscaler
Read why it matters →Two procedural patterns that materially change how to read the local-moratorium tape and the PJM NCBL timeline. (1) Pennsylvania's 180-day moratorium-by-MPC-invocation: the state Municipalities Planning Code has provisions that allow any municipality to...
Morning-Times / Modo Energy / RTO Insider / PA MPC / Independent Market Monitor for PJM ↗
PJMFERCMoratoriumBehind-the-meterCapacity market
Read why it matters →PJM's 'Powering Reliability Through Market Design' paper is the most significant single regulatory-process document in the PJM footprint since FERC's December 18, 2025 order on co-located generation (which Cliff has been tracking via the pjm-er26-1088 page)....
PJM Inside Lines / Utility Dive / Modo Energy / PR Newswire / ROI-NJ / Daily Caller (yournews) ↗
PJMFERCVirginiaWisconsinInterconnectionBehind-the-meterCapacity market
Read why it matters →The North Carolina cluster has reached critical mass through the May 4-10 window in three layered ways. Layer 1 (local moratoria): Harnett County's unanimous 1-year approval on May 4 — driven by Sen. Jim Burgin's disclosure that a developer was 'earnestly...
NC Newsline / Sanford Herald / Axios Charlotte / WBTV / Spring Hope Enterprise / NCleg ↗
VirginiaNorth CarolinaWisconsinMaineMoratoriumRatepayer protection
Read why it matters →Two updates on the local-moratorium tape that fill in the May 11 picture. (1) Kingsland GA: the City Council votes tonight on a 90-day moratorium that City Manager Lee Spell publicly recommended on April 24. The political context shifted last week when...
Georgia Public Broadcasting / The Current GA / Marengo Township / Bridge Michigan / WKAR Public Media ↗
TexasVirginiaWisconsinOhioMoratoriumBallot initiative
Read why it matters →Pending-item resolution for May 11. Colorado SB 102 (Sen. Cathy Kipp, March 18 introduction): the bill would have banned utility economic agreements incentivizing data centers and required 100% new-renewable sourcing by 2031. Per Colorado Politics ('Despite...
Colorado Politics / CPR / Seehafer News / 9News Denver / WBTV / ERCOT ↗
ERCOTPJMFERCColoradoMoratoriumInterconnectionRatepayer protection
Read why it matters →Three regulatory events in the same 24-hour window on May 8 — Pennsylvania PUC's model-tariff vote, PPL Electric's pending rate-case settlement (filed March 13, ALJ recommendation April 17, effective July 1), and Oregon PUC's PGE Schedule 96 directive —...
WHYY / WESA / Utility Dive / KGW / KOIN / Beaver County Radio / RTO Insider ↗
ERCOTPJMFERCWisconsinMoratoriumInterconnectionBehind-the-meter
Read why it matters →NVIDIA and IREN announced the partnership on May 7 with two simultaneous structural elements. The first is a $2.1B equity warrant: NVIDIA receives a 5-year right to purchase up to 30 million IREN ordinary shares at an exercise price of $70 per share (subject...
NVIDIA Newsroom / CNBC / DCD / Globenewswire ↗
ERCOTTexasInterconnectionHyperscaler
Read why it matters →Hut 8 Corp (Nasdaq: HUT) — formerly a Bitcoin miner, similar pivot trajectory to IREN — announced on May 6 the commercialization of the first phase of its Beacon Point AI data center campus on a 525-acre site in Nueces County, Texas (near Corpus Christi). The...
Hut 8 / PRNewswire / DCD / KRIS-TV / CoinDesk ↗
ERCOTTexasInterconnectionBehind-the-meterHyperscaler
Read why it matters →Four ongoing local-level developments tracked into May 9-10. (1) Box Elder UT referendum filing: data-center opponents in Box Elder County applied this week (reported by CNN May 9 syndication, KSL May 7 reporting) for a November 2026 ballot referendum to...
CNN / KSL / WVPE / 95.3 MNC / Seehafer News / WBTV ↗
North CarolinaWisconsinOhioGeorgiaMoratoriumRatepayer protectionHyperscaler
Read why it matters →HB 1030 was Colorado's primary 2026 attempt to attract data-center investment via tax incentives — the bill was first introduced in January and modeled loosely on the sales-and-use exemption regimes that Texas, Virginia, Georgia, Ohio, Iowa, Nebraska, and...
KUNC / CPR News / The Colorado Sun / The Durango Herald ↗
ERCOTPJMMISOTexasMoratoriumTax incentiveRatepayer protection
Read why it matters →PGRR145 (Planning Guide Revision Request 145) and NPRR1325 (Nodal Protocol Revision Request 1325) are the two governance instruments that establish ERCOT's 'Batch Zero' large-load interconnection process — PGRR145 sets the planning-guide framework and...
ERCOT NPRR1325 + PGRR145 issue pages ↗
ERCOTTexasInterconnection
Read why it matters →Four jurisdictions moved on data-center moratoria in the May 4-8 window. (1) Durham NC city council unanimously approved a 60-day moratorium May 4. The 60-day duration is *not* the council's policy preference — Council member Nate Baker explicitly stated 'I...
WRAL / Indy Week / Axios Charlotte / Capitol Hill Seattle News / Lakeland Times / Northwoods River News ↗
North CarolinaWisconsinGeorgiaWashingtonMoratoriumRatepayer protection
Read why it matters →Microsoft's 2030 climate commitments include three distinct goals: (a) carbon-negative by 2030, (b) water-positive by 2030, and (c) 100% renewable matching for all electricity consumption on a 24/7 basis (the 'hourly matching' goal). Annual 100% renewable...
Bloomberg / TechCrunch / Seeking Alpha / Reuters / Yahoo Finance ↗
TexasWisconsinAir permitBehind-the-meterHyperscaler
Read why it matters →Three distinct state-level instruments and their May status: (1) Ohio Prohibition of Data Center Construction Amendment — a citizen-initiated state constitutional amendment that would write a 25 MW cap into Ohio's constitution. AG Dave Yost certified the...
Ballotpedia / Ohio Capital Journal / 13abc / Indiana General Assembly / Maine Governor's Office ↗
WisconsinOhioFloridaIndianaMoratoriumRatepayer protectionBallot initiative
Read why it matters →SB 484 (sponsored by Sen. Bryan Ávila with companion in the Florida House) cleared both chambers earlier in the 2026 session and was signed at a Lakeland press conference May 7 alongside several other technology-related bills. The statute directs the Florida...
WFSU / Florida Politics / Tallahassee Reports / Florida Senate (SB 484 bill text) ↗
TexasVirginiaOhioFloridaTax incentive
Read why it matters →EBCI is a federally recognized Native American tribe headquartered in Cherokee, North Carolina, with roughly 57,000 acres of trust land (the Qualla Boundary) primarily in Swain and Jackson Counties in the Great Smoky Mountains region. The ordinance passed...
WUNC / Cherokee One Feather / Smoky Mountain News ↗
North CarolinaOklahomaMoratorium
Read why it matters →NPRR1325 — Nodal Protocol Revision Request 1325 — operationalizes the Provisional Controllable Load Resource framework, which lets large loads (data centers in particular) commit to a partial-firm + curtailable service profile in exchange for a faster path...
ERCOT NPRR1325 issue page / EPE Consulting tracker ↗
ERCOTTexasInterconnection
Read why it matters →Five separate jurisdictions moved on data-center moratoria or rejections in the May 4-8 window. (1) Northampton County NC (rural northeastern NC, ~17,500 population, near the Roanoke-Chowan area) approved a 32-month pause unanimously on May 4 after residents...
NC Health News / Fox Baltimore / The Banner / Post & Courier (Colleton) / First Alert 4 (Ferguson) / KSHB (Gardner) / Tom's Hardware ↗
North CarolinaGeorgiaMarylandKansasMoratoriumTax incentive
Read why it matters →All four hyperscalers reported Q1 2026 earnings April 29 and collectively raised 2026 capex guidance to $725B vs $410B actually-spent in 2025 — a 77% YoY increase. Microsoft set 2026 capex at $190B (well above the $152B analyst consensus); CFO Amy Hood...
Tom's Hardware / Yahoo Finance / Sherwood News / CNBC ↗
TexasArizonaUtahBehind-the-meterHyperscaler
Read why it matters →Virginia Department of Environmental Quality's APG-576 (Diesel Engine-Generator Set Procedure for Writing New and Modified Permits) became effective April 9, 2026, with the new BACT (Best Available Control Technology) requirements applicable to air permit...
Virginia DEQ / Trinity Consultants ↗
EPATexasVirginiaAir permitInterconnectionBehind-the-meter
Read why it matters →Maricopa County, Arizona supervisors approved a Military Compatibility Permit for Project Baccara, a Takanock-developed campus comprising two 1 million-square-foot data centers plus a 700 MW on-site gas generating station. The site is roughly 1 mile from Luke...
12 News Phoenix / KJZZ / FOX 10 Phoenix ↗
ArizonaMoratoriumBehind-the-meter
Read why it matters →Eight separate municipal / county data-center moratorium or restriction actions in 48 hours. Sedgwick County (Wichita-area) Kansas commissioners voted unanimously to extend their moratorium for an additional 90 days to September 11; this is the second...
KWCH (Sedgwick) / WTOC (Bulloch) / Seattle CHS / Bethesda Magazine (MoCo) / Vindicator (Lordstown) / Strisker daily notes ↗
OhioGeorgiaWashingtonMarylandMoratoriumHyperscaler
Read why it matters →SpaceX filed an application for property tax abatements with Grimes County, Texas, for a semiconductor fabrication and advanced-packaging facility branded 'Terafab' that would cost $55 billion in initial phases and up to $119 billion if all planned expansions...
Tom's Hardware / KBTX / TechCrunch / ERCOT ↗
ERCOTTexasTax incentiveInterconnectionHyperscaler
Read why it matters →PJM filed its Expedited Interconnection Track (EIT) proposal February 27, 2026 in response to FERC Order EL25-49 (issued December 18, 2025) directing PJM to revise its Open Access Transmission Tariff to address co-located load and behind-the-meter generation...
FERC / PJM / Day Pitney / Digitimes ↗
ERCOTPJMFERCTexasInterconnectionBehind-the-meterFERC action
Read why it matters →Box Elder County commissioners voted unanimously to approve two resolutions in support of a 40,000-acre data center campus on an unincorporated site in northern Utah. The project, dubbed Stratos and developed by O'Leary Digital, would span 40,000 acres of...
Utah News Dispatch / KSL.com ↗
ERCOTPJMMISONorth CarolinaMoratoriumInterconnectionBehind-the-meter
Read why it matters →Meta Platforms is working with Morgan Stanley and JPMorgan Chase on a roughly $13 billion financing package for its El Paso, Texas data center, sources told Bloomberg and Reuters. The majority of the package is expected to be structured as debt, with the...
Bloomberg / Reuters via Investing.com ↗
ERCOTTexasInterconnectionHyperscaler
Read why it matters →Durham City Council on Monday unanimously approved a 60-day moratorium covering data centers, data processing, and cryptocurrency mining development, with more than 30 people speaking during public comment. The council had originally considered a 24-month...
WRAL / Indy Week ↗
North CarolinaMoratorium
Read why it matters →ERCOT's PRS is scheduled to vote on PGRR145 and NPRR1325 today, with the companion ROS vote tomorrow (May 7) and the Technical Advisory Committee (TAC) final stakeholder vote May 19-20. PGRR145, filed March 4, would create the Batch Zero process for large...
ERCOT / Zero Emission Grid ↗
ERCOTTexasInterconnectionHyperscaler
Read why it matters →At Monday's contentious Hermantown MN City Council meeting, a Google Technical Infrastructure team representative gave the company's first in-person presentation on the proposed 1.2 million sq ft data-center site. Project disclosures: $650 million for Phase...
MPR News / Northern News Now ↗
North CarolinaMinnesotaMoratoriumTax incentiveHyperscaler
Read why it matters →After a packed Hermantown City Council meeting Monday night with hours of public comment, Councilor John Geissler moved to table both the tax-abatement and the development agreement for Google's 1.2 million sq ft data center, citing the need for clarity on...
Duluth News Tribune ↗
North CarolinaMinnesotaMoratoriumTax incentiveHyperscaler
Read why it matters →Kirk Tovey, the Florida businessman behind a planned data center on a 682-acre tract in Kingsland GA, withdrew his rezoning application (industrial-park rezone + partial annexation by Kingsland) hours before the city's planning and zoning board was set to...
The Current GA ↗
FloridaMoratorium
Read why it matters →WRAL and Data Center Knowledge confirm North Carolina lawmakers have moved HB 1004, the Ratepayer and Resource Protection Act, into the 2025-2026 General Assembly. Filed April 27, 2026. Threshold: facilities with peak electricity demand of ≥40 MW...
Data Center Knowledge ↗
ERCOTPJMFERCTexasMoratoriumInterconnectionBehind-the-meter
Read why it matters →EdgeCore Digital Infrastructure announced the close of two limited-recourse senior secured term loans totaling $1.5 billion to fund construction of two single-tenant hyperscale data centers in Sterling, VA. AS01 (initial occupancy November 2026) and AS02...
Morningstar / EdgeCore press release ↗
Hyperscaler
Read why it matters →The Sedgwick County KS Board of Commissioners is set to vote tomorrow (May 6) on whether to extend the data-center application moratorium beyond its current June 11 expiration. Current pause sequence: enacted Jan 13, extended unanimously March 4, expiring...
KWCH ↗
SPPFERCKansasMoratoriumInterconnection
Read why it matters →Amazon Web Services filed suit in May 2025 against King George County after the new Board of Supervisors voted to renegotiate the 2023 performance agreement for AWS's 7.5M sq ft / $6B data-center campus. Amazon is seeking enforcement of the original zoning...
Washington Post (paywalled) via DCD ↗
VirginiaMoratoriumHyperscaler
Read why it matters →PJM Interconnection's Critical Issue Fast Path Reliability Backstop Procurement (CIFP-RBP) proposal, released April 10 and detailed in its April 16 stakeholder package, calls for a one-time two-phase backstop procurement of 14.9 GW of new resources to serve...
Utility Dive ↗
ERCOTPJMFERCMoratoriumInterconnectionFERC action
Read why it matters →PJM Inside Lines and Utility Dive both confirmed April 29 that 811 new generation projects representing 220 GW of nameplate capacity have entered PJM's first interconnection cycle since the queue was paused for reform in 2022. Mix by fuel: gas-fired 106 GW...
Utility Dive ↗
PJMFERCAir permitInterconnectionBehind-the-meter
Read why it matters →Bloomberg, DCD, and CoStar all confirmed April 29–30 that Compass Datacenters is pulling out of the Prince William Digital Gateway data center corridor in Northern Virginia. Sequence: Virginia Court of Appeals blocked the project March 31 after years of...
Bloomberg ↗
ERCOTVirginia
Read why it matters →Fleet Data Centers filed applications with Nevada state energy regulators April 20 to construct more than 350 MW of behind-the-meter natural gas and diesel power for two data center campuses at Tahoe Reno Industrial Center (TRIC) in Storey County, NV. South...
Carson Now ↗
ERCOTTexasUtahKansasMoratoriumAir permitInterconnection
Read why it matters →Two parallel local-opposition lawsuits this past week. Yorkville, IL: Preserve our Yorkville & Community filed against the City of Yorkville to halt the 1,034-acre Project Cardinal data center; April 24 court hearing extended to May 8 with both legal teams...
Shaw Local (Yorkville) ↗
MinnesotaMoratoriumTax incentiveHyperscaler
Read why it matters →Two large hyperscaler footprint moves this past week. AWS: ~$15B planned investment in Northern Indiana for multiple data center campuses adding approximately 2.4 GW of capacity dedicated to cloud computing and AI workloads. Microsoft: the $3.3B Fairwater...
Microsoft / Mount Pleasant village ↗
PJMMISOWisconsinOhioMoratoriumBallot initiativeHyperscaler
Read why it matters →Three Seattle councilmembers (Juarez D5, Lin D2, Hollingsworth President) announced April 30 they will introduce an emergency 365-day data center moratorium with the bill drop targeted for mid-May; a public hearing is required within 60 days of adoption....
Spokesman-Review ↗
WashingtonMoratoriumInterconnection
Read why it matters →The Camden County (GA) Board of Commissioners is set to vote Tuesday May 6 on adopting a 9-month moratorium on data centers. The proposal is driven by speculation that a Florida-based businessman has requested rezoning of land in Kingsland and the county for...
The Current GA ↗
GeorgiaFloridaMaineMoratorium
Read why it matters →Sedgwick County (Wichita, KS) commissioners are set to vote Wednesday May 6 on another 90-day extension of the freeze on new data center applications. The county originally passed a 90-day moratorium on Jan 15, 2026, then unanimously extended it on March 4 to...
KWCH (Wichita) ↗
KansasMoratorium
Read why it matters →Denver City Council scheduled a second reading and public hearing on the proposed data center moratorium for May 18 with an anticipated effective date of May 21 if it passes. The pause would block all new zoning permits and site development plans for data...
9News Denver ↗
ColoradoMoratoriumAir permit
Read why it matters →Per yesterday's update, the Virginia General Assembly rejected most of Governor Spanberger's substantive amendments to HB 1393 (Bolling) / SB 253 at the April 22 reconvened session, returning the bills to her desk as-passed. The constitutional clock to sign,...
Virginia Mercury ↗
VirginiaTax incentive
Read why it matters →Joule Capital Partners, Caterpillar, and Wheeler Machinery (the Cat dealer for Utah/Idaho/Nevada/Wyoming/Montana) announced an agreement to power Joule's 'super-compute-ready' campus in Millard County, UT — 4,000 acres, gigawatt-scale operational launch in...
Caterpillar press release ↗
UtahMoratoriumAir permitInterconnection
Read why it matters →Advocates for an Ohio constitutional amendment banning new data center construction with aggregate power demand exceeding 25 MW are working to collect 413,000 valid signatures by July 1 to qualify for the November 3, 2026 statewide ballot. Petitioning was...
Ohio Capital Journal ↗
OhioIllinoisMoratoriumHyperscaler
Read why it matters →Alphabet, Amazon, Meta, and Microsoft all reported Q1 essentially simultaneously this past week. Final guidance: Amazon ~$200B (vs $125B in 2025), Google $175–185B (vs $91B), Meta $115–135B (vs $72B), Microsoft $110–120B (vs $90B). Total Big Four 2026 capex...
Tom's Hardware ↗
PJMMISOVirginiaOhioMoratoriumHyperscaler
Read why it matters →Dominion Energy reported Q1 2026 operating EPS $0.95 vs $0.86 consensus, revenue $5.02B vs $4.47B. Commercial sales +8.4% YoY led by data centers; weather-normalized sales +4.3% LTM. Total contracted data center capacity reached ~51 GW as of March 2026, a...
Dominion Energy Q1 2026 earnings (Investing.com) ↗
PJMVirginia
Read why it matters →The Virginia legislature on Apr 29 rejected all three of Governor Spanberger's substantive amendments to HB 1393 (Bolling) / SB 253: (1) striking the explicit cost-shift mechanism that assigns capacity + distribution infrastructure costs to high-load...
Inside Climate News ↗
VirginiaAir permitHyperscaler
Read why it matters →QTS Realty Trust filed an appeal Apr 30 (hours before the deadline) to the Virginia Supreme Court asking it to overturn the Court of Appeals ruling that nullified Prince William County's 2023 zoning amendments authorizing the 22M sqft Digital Gateway...
Washington Post ↗
VirginiaMoratoriumInterconnection
Read why it matters →Maine House voted 72-65 on Apr 29 to override Gov. Janet Mills' Apr 24 veto of LD 307, falling short of the two-thirds needed. LD 307 would have prevented state, local, and quasi-governmental agencies from issuing permits or approvals for new data centers ≥20...
Maine Public ↗
MaineMoratorium
Read why it matters →Tom's Hardware and Digitimes reported May 2 that OpenAI has in practice walked away from the original Stargate JV model (Jan 2025 announcement: $500B / 10 GW by 2029 with SoftBank + Oracle) and is now pursuing large bilateral compute-leasing deals — primarily...
Tom's Hardware ↗
Behind-the-meterHyperscaler
Read why it matters →NuScale Power (NYSE: SMR) gained over 10% Apr 30 on Amazon's announcement of three new SMR-backing deals, including a $500M investment in X-energy. The broader nuclear sector rallied; Amazon's structuring is similar to its prior June 2025 MOU with Dominion...
CoinCentral ↗
PJMVirginiaAir permitInterconnectionHyperscaler
Read why it matters →Related Digital announced Apr 25 financing close on the $16B / 1.4 GW 'The Barn' campus in Saline Township, Michigan. Capital stack: equity from Related Digital + Blackstone funds; long-dated fixed-rate debt anchored by PIMCO-managed funds and accounts. DTE...
Bank of America newsroom (Related Digital announcement) ↗
Behind-the-meterRatepayer protectionHyperscaler
Read why it matters →Indiana Utility Regulatory Commission unanimously approved the I&M / Google demand-response agreement for the $2B Fort Wayne campus. Google agreed to cut load when the grid is strained and to share clean-energy capacity with the system; I&M will discount...
21Alive News ↗
ERCOTTexasIndianaInterconnectionHyperscaler
Read why it matters →OG&E announced a contract with Google for three new data centers in Muskogee and Stillwater. Google will cover 100% of grid-connection costs and pay all contracted charges regardless of consumption (take-or-pay capacity), and will contribute capacity from two...
OG&E press release ↗
TexasOklahomaInterconnectionBehind-the-meterHyperscaler
Read why it matters →The Data Center Consumer Ratepayer Protection Act of 2026 cleared the OK Senate unanimously and now returns to the House. Bill defines 'large load customers' as new facilities ≥75 MW grid demand; requires those customers cover their share of electricity +...
Oklahoma Farm Report ↗
ERCOTTexasOklahomaMoratoriumInterconnectionRatepayer protection
Read why it matters →DTE Energy filed a $474.3M rate-increase request, with a conditional commitment to pause subsequent rate-increase requests for two years if the 1.4 GW Oracle/OpenAI 'The Barn' Saline Township campus energizes by 2027 and DTE wins other unspecified data center...
Bridge Detroit ↗
MoratoriumRatepayer protectionHyperscaler
Read why it matters →Virginia DEQ's revised guidance APG-576 ('Diesel Engine-Generator Set Procedure for Writing New and Modified Permits') became effective April 9, 2026. New sections set presumptive BACT for both emergency and non-emergency gen-sets at data center stationary...
Hunton The Nickel Report ↗
VirginiaAir permitBehind-the-meter
Read why it matters →Amazon Apr 29 evening: Q1 net sales $181.5B (+17% YoY), EPS $2.78 vs $1.62 consensus, AWS revenue $37.59B (+28%, 15-quarter high). Andy Jassy committed ~$200B 2026 capex; Q1 capex $44.2B (+77% YoY). Bedrock token volume in Q1 alone exceeded all prior years...
Stocktwits ↗
Hyperscaler
Read why it matters →Q1 2026 earnings dropped Apr 29. Microsoft outlined $190B in CY2026 capex (vs. ~$152B analyst consensus). Alphabet raised the full-year range to $180-190B from $175-185B and CFO Anat Ashkenazi said 2027 will 'significantly increase' from there. Meta raised to...
Fortune ↗
ERCOTInterconnectionHyperscaler
Read why it matters →Reconvened session Apr 22 (vote count finalized through Apr 29): General Assembly bucked Spanberger on the Dominion-backed energy / data center package. Her three proposed weakeners — SCC sole discretion over undergrounding, halved spending cap, opt-out...
Inside Climate News ↗
TexasVirginiaInterconnection
Read why it matters →PJM issued the RFI Apr 16 to LSEs, large load participants, hyperscalers, generation developers, DR/DER aggregators, EDCs, and state commissions. Two-phase backstop procurement for 14.9 GW: bilateral phase Sept-Mar (PJM + Charles River Associates as...
Utility Dive ↗
PJMFERCVirginiaOhioInterconnectionFERC action
Read why it matters →Mills vetoed the bill Apr 24 (would have imposed 18-month moratorium on data centers ≥20MW until Nov 2027); override attempt Apr 29 failed despite supporters lining the State House halls. Mills said she would have signed if it carved out the Androscoggin Mill...
Maine Morning Star ↗
MaineMoratorium
Read why it matters →Manitowoc County WI passed unanimous 18-month moratorium Apr 21 after a developer approached three towns with land offers. Swain County NC unanimous 12-month Apr 22. Orange County NC unanimous 1-year Apr 22. Weaverville NC reclassified data centers + crypto...
Good Jobs First ↗
TexasMoratoriumInterconnection
Read why it matters →Apr 20 announcement: both top execs stepped down (Neugebauer remains on Board, Everson resigned from CFO role, both retained as observers). Interim Office of the CEO co-led by COO Jacobo Ortiz Blanes and board observer Anna Bofa; Heidrick & Struggles...
Fortune ↗
PJMTexasAir permitBehind-the-meterHyperscaler
Read why it matters →BloombergNEF (released Apr 24, covered Apr 27): CCGT capex jumped from <$1,500/kW (2023) to $2,157/kW (2025). Global turbine orders at 110 GW vs 60–70 GW manufacturing capacity at the Big Three. This is the BTM-economics input to every de-rate-calculator...
TechCrunch ↗
ERCOTInterconnectionBehind-the-meter
Read why it matters →Bloomberg / Fortune (Apr 24): largest US data center projects deploying BESS alongside gas gens, taking advantage of battery cost drops. Hybrid stack — gas for capacity, batteries for ride-through and ancillary capture — is becoming default rather than...
Fortune ↗
Behind-the-meter
Read why it matters →Utility Dive: DOE's October interconnection-reform principles (the 'data center backstop / accelerated study' set) were due for FERC action by Apr 30. FERC tee'd up June instead. Adds a federal interconnection-reform docket on top of ER26-1088 / RM26-4 — a...
Utility Dive ↗
PJMFERCInterconnection
Read why it matters →Analysis presented to PJM Interconnection's governing board: roughly 49 large gas-plant equivalents short by 2028. Aligns with the air-permit / interruptible-load wedge — 49 GW of unrealized capacity is the same number as 'load that needs to be derated,...
ENR ↗
PJMInterconnectionBehind-the-meter
Read why it matters →LandGate published a 'definitive' BTM whitepaper and shipped a Battery Storage Analysis tool. Ships in the same window as their Topos acquisition (Dec 2025) and Enterprise AI Data Agent (Feb 2026). The 2026-04-27 strategy/landgate.md sweep is now slightly...
PR Newswire ↗
Air permitBehind-the-meter
Read why it matters →Fluidstack — the AI-DC-as-a-service play with the $50B Anthropic deal — raising $1B at $18B led by Jane Street, more than 2x the December round. Not a Cliff competitor, but the operator-side capex flowing through is what makes the site readiness intelligence...
TechCrunch ↗
Interconnection
Read why it matters →APLD's Delta Forge 1 (430 MW campus) leased 300 MW to a US-based 'high investment-grade' hyperscaler — $7.5B contracted value over ~15 years. Backs into ~$24/kW-month, which is the right reference point for any 'what does a megawatt sell for' conversation...
Applied Digital ↗
ERCOT
Read why it matters →Escalation beyond the Mississippi Southaven air-permit appeal you already wikied: separate civil suit alleging xAI ran turbines in Memphis without required air permits. Couples with the Apr 9 SELC/NAACP appeal of the Southaven permit and the Jan 15 NSPS KKKKa...
CNBC ↗
Hyperscaler
Read why it matters →